Airworthiness Directive

AD 2015-06-06 80 FR 16555 Active

Federal Aviation Administration · 14 CFR part 39

Requires an inspection of the affected EPs and attachment structure for damage, an inspection of the earth cables of the generator and propeller de-ice system for signs of overheating and arcing damage, a torque check of the…

FR document
2015-06751
Amendment
39-18124
Published
2015-03-30
Effective
2015-05-04
Models covered
1

Last live check: 2026-11-15

This page is a reference Record, not an airworthiness or compliance determination. Read the full notice.

AD

2015-06-06

FR doc 2015-06751 · 80 FR 16555

AD 2015-06-06Published 2015-03-30Effective 2015-05-04

FAA rule - 14 CFR 39

FAA rule. Compliance with an applicable AD is required under 14 CFR 39.7. Check its effective date, applicability, compliance times and current status.

Requires an inspection of the affected EPs and attachment structure for damage, an inspection of the earth cables of the generator and propeller de-ice system for signs of overheating and arcing damage, a torque check of the affected EP stiff nuts, an electrical high current bonding check of the bracket, and corrective actions if necessary.

Why this AD
Prompted by a report of the failure, due to overheat, of a bracket on which the earth post (EP) for the generator and propeller de-ice systems is located.
Applies to
BAE Systems (Operations) Limited Airplanes · 1 model in our index, listed below
Full official abstract

We are adopting a new airworthiness directive (AD) for all BAE Systems (Operations) Limited Model 4101 airplanes. This AD was prompted by a report of the failure, due to overheat, of a bracket on which the earth post (EP) for the generator and propeller de-ice systems is located. This AD requires an inspection of the affected EPs and attachment structure for damage, an inspection of the earth cables of the generator and propeller de-ice system for signs of overheating and arcing damage, a torque check of the affected EP stiff nuts, an electrical high current bonding check of the bracket, and corrective actions if necessary. We are issuing this AD to detect and correct an overheat failure of the EPs for the generator and propeller de-ice system, and possible degradation of the wing front spar cap and/or web, which could affect the structural integrity of the wing.

More directives for British Aerospace Jetstream 41

  1. AD 2025-16-03 Airworthiness Directives; BAE Systems (Operations) Limited Airplanes Effective 2025-09-18
  2. AD 2023-12-22 Airworthiness Directives; BAE Systems (Operations) Limited Airplanes Effective 2023-08-23
  3. AD 2023-02-06 Airworthiness Directives; BAE Systems (Operations) Limited Airplanes Effective 2023-03-14
  4. AD 2022-14-08 Airworthiness Directives; BAE Systems (Operations) Limited Airplanes Effective 2022-08-18
  5. AD 2018-19-24 Airworthiness Directives; BAE Systems (Operations) Limited Airplanes Effective 2018-11-07

All British Aerospace Jetstream 41 directives

Applies to 1 model in our index

This page is a reference Record, not an airworthiness or compliance determination. Official FAA and manufacturer sources control over our restatement, subject to governing law. Check applicability, current requirements and incorporated documents before acting. The owner or operator remains responsible for airworthiness and required records under 14 CFR 91.403 and 91.417, as applicable. Terms of Use: /terms.