Airworthiness Directive

AD 98-18-07 63 FR 45685 Active

Federal Aviation Administration · 14 CFR part 39

Requires inspecting the airplanes that are equipped with a 50A generator system for a 70A generator.

FR document
98-22822
Amendment
39-10723
Published
1998-08-27
Effective
1998-10-12
Models covered
1

Last live check: 2026-08-19

This page is a reference Record, not an airworthiness or compliance determination. Official FAA and manufacturer sources control over our restatement, subject to governing law. Check applicability, current requirements and incorporated documents before acting. The owner or operator remains responsible for airworthiness and required records under 14 CFR 91.403 and 91.417, as applicable. Terms of Use: /terms.
AD

98-18-07

FR doc 98-22822 · 63 FR 45685

AD 98-18-07Published 1998-08-27Effective 1998-10-12

FAA rule - 14 CFR 39

FAA rule. Compliance with an applicable AD is required under 14 CFR 39.7. Check its effective date, applicability, compliance times and current status.

Requires inspecting the airplanes that are equipped with a 50A generator system for a 70A generator.

Full official abstract

This amendment adopts a new airworthiness directive (AD) that applies to certain Pilatus Britten-Norman Ltd. (PBN) BN-2, BN-2A, BN- 2B, and BN-2A MK. 111 series airplanes that are equipped with a PBN Modification NB/M/256, 50A generator system. This AD requires inspecting the airplanes that are equipped with a 50A generator system for a 70A generator. If a 70A generator is installed, this AD requires replacing the 70A generator with a 50A generator, or (for the BN-2, BN-2A, and BN-2B series only) upgrading the airplane generator system to a 70A system to match the 70A generator. This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for the United Kingdom. The actions specified by this AD are intended to detect and correct damage to the components of the electrical system, which could result in electrical system failure during critical phases of flight.

More directives for Britten-Norman BN-2 Islander

  1. AD 2025-01-01 Airworthiness Directives; Britten-Norman Aerospace Ltd. Airplanes Effective 2025-03-11
  2. AD 2024-08-03 Airworthiness Directives; Britten-Norman Aircraft, Ltd. Airplanes Effective 2024-06-03
  3. AD 2021-18-01 Airworthiness Directives; B-N Group Ltd. Airplanes Effective 2021-10-14
  4. AD 2016-26-09 Airworthiness Directives; B-N Group Ltd. Airplanes Effective 2017-02-09
  5. AD 2016-06-01 Airworthiness Directives; B-N Group Ltd. Airplanes Effective 2016-04-19

All Britten-Norman BN-2 Islander directives

Applies to 1 model in our index