Airworthiness Directive

AD 2005-19-15 70 FR 55230 Active

Federal Aviation Administration · 14 CFR part 39

FR document
05-18519
Amendment
39-14280
Published
2005-09-21
Effective
2005-10-26
Models covered
1
Last live check
2026-10-03
This page is a reference Record, not an airworthiness or compliance determination. Official FAA and manufacturer sources control over our restatement, subject to governing law. Check applicability, current requirements and incorporated documents before acting. The owner or operator remains responsible for airworthiness and required records under 14 CFR 91.403 and 91.417, as applicable. Terms of Use: /terms.
AD

2005-19-15

FR doc 05-18519 · 70 FR 55230

AD 2005-19-15Published 2005-09-21Effective 2005-10-26

FAA rule - 14 CFR 39

FAA rule. Compliance with an applicable AD is required under 14 CFR 39.7. Check its effective date, applicability, compliance times and current status.

Requires operators to determine the number of flight cycles accumulated on each component of the main landing gear (MLG) and the nose landing gear (NLG), and to replace each component that reaches its life limit with a…

Full official abstract

The FAA is superseding an existing airworthiness directive (AD), which applies to all BAE Systems (Operations) Limited (Jetstream) Model 4101 airplanes. That AD currently requires operators to determine the number of flight cycles accumulated on each component of the main landing gear (MLG) and the nose landing gear (NLG), and to replace each component that reaches its life limit with a serviceable component. The existing AD also requires operators to revise the Airworthiness Limitations section (ALS) of the Instructions for Continued Airworthiness in the aircraft maintenance manual to reflect the new life limits. This new AD requires revising the ALS to incorporate extended and more restrictive life limits for structurally significant items. This AD is prompted by engineering analysis of fleet operations which resulted in more restrictive life limits. We are issuing this AD to prevent failure of certain structurally significant items, including the MLG and the NLG, which could result in reduced structural integrity of the airplane.

More directives for British Aerospace Jetstream 41

  1. AD 2009-16-01 Airworthiness Directives; BAE Systems (Operations) Limited (Jetstream) M... 2009-08-05
  2. AD 2009-10-02 Airworthiness Directives; BAE Systems (Operations) Limited (Jetstream) M... 2009-05-07
  3. AD 2009-02-07 Airworthiness Directives; BAE Systems (Operations) Limited (Jetstream) M... 2009-02-26
  4. AD 2008-18-02 Airworthiness Directives; BAE Systems (Operations) Limited (Jetstream) M... 2009-02-20
  5. AD 2008-17-04 Airworthiness Directives; BAE Systems (Operations) Limited (Jetstream) M... 2008-08-19

All British Aerospace Jetstream 41 directives

Applies to 1 model in our index